Keeping your community covered. We're committed to producing high-quality, fact-based news and information that gives you the facts in this community we call home. If our work has helped you stay informed, take action, or feel more connected to Windham County – please give now to help us reach our goal of raising $150,000 by December 31st.
Keeping your community covered. We're committed to producing high-quality, fact-based news and information that gives you the facts in this community we call home. If our work has helped you stay informed, take action, or feel more connected to Windham County – please give now to help us reach our goal of raising $150,000 by December 31st.
For more than a century, our town has been a cutting-edge electricity producer for New England. This proud history has been dominated by two reliable, low-emission, affordable energy generators.
In a plan that we call Re-Energizing Vernon, the Planning and Economic Development Commission is now drafting the third chapter: exploring the possibility of a multi-fuel, clean-energy, affordable micro-grid on the site of Vermont Yankee.
Vernon has produced electricity since the late 1800s. The existing 32-megawatt Vernon dam began operating in 1909.
Like the proposed micro-grid, the Vernon generating equipment was innovative when designed. It featured vertical turbines when horizontal was the norm. The concrete dam built on bedrock proved sturdier than the conventional rock-filled timber dams.